dead reckoning
英 [ded ˈrekənɪŋ]
美 [ded ˈrekənɪŋ]
推算定位;航位推测法
英英释义
noun
- navigation without the aid of celestial observations
- an estimate based on little or no information
双语例句
- To meet the scalability and message filtering requirements of data distribution management ( DDM) in distributed interactive simulation ( DIS), a fuzzy dead reckoning ( DR) algorithm was proposed.
为了满足分布式交互仿真(DIS)中数据分布管理(DDM)对可扩展性和信息过滤的要求,提出一种模糊推算定位(DR)算法。 - Application of Magnetic Sensor to Dead Reckoning for Vehicle
磁阻传感器在车辆航位推算系统中的应用研究 - Through combining dead reckoning, GPS positioning information and Map-Matching algorithm, this paper represents an algorithm to correct sensors parameters in In-Vehicle Navigation System.
针对车载组合导航信息融合的高精度、高可靠性等要求,提出了一种组合导航的自适应集中滤波算法。 - Pose tracking based dead reckoning and global localization based landmark recognization were designed for self-localization, location mechanism was designed integrating the two methods.
本文设计了基于航位推算法的位姿跟踪和基于路标识别的全局定位2种自定位方法,并结合这2种方法设计了行走中的定位机制。 - Research on a method for dead reckoning parameter estimation in pedestrian navigation system
行人导航系统中航迹推算参数估计方法的研究 - Self-positioning of robot based on dead reckoning and ultrasonic data fusion Research and Application of DR Algorithm in Heading-off Strategy
基于推算定位和超声波定位融合的机器人自主定位技术推算定位算法在拦截策略中的研究与应用 - Homing experiment system was constructed and moving track of robot was recorded by dead reckoning method. To improve the positioning accuracy, the robot tracked skid was compensated and azimuth error was corrected using angle estimation based on panoramic vision.
构建了完整的实验系统,采用推算式定位方法记录机器人在实验过程中的轨迹,对履带打滑进行补偿,利用全景视觉校正机器人的方位角,提高推算式定位方法的精度。 - Inertial sensors localization uses dead reckoning method, which mainly includes three factors: step number, heading and step length.
惯性传感器定位使用航迹推算方法可以实现连续无缝的定位,航迹推算方法涉及到三个因素:步数、航向和步长。 - Dead Reckoning ( DR) algorithm is an important technique which is widely used in distributed interactive simulation.
DR算法是分布交互仿真中的一种被普遍采用的重要技术。 - Predictable method of investment of development project have been put foreword, dead reckoning models of decision cost of development project and duration expensive have been built.
提出开发规划方案投资估算方法,同时建立了决策成本和期间费用预测模型。
